membrane

(redirected from Membrane roofing)
Also found in: Dictionary, Medical, Encyclopedia, Wikipedia.
Graphic Thesaurus  🔍
Display ON
Animation ON
Legend
Synonym
Antonym
Related
  • noun

Synonyms for membrane

Synonyms for membrane

a thin outer covering of an object

Synonyms for membrane

References in periodicals archive ?
Clearly, flexible membrane roofing systems meet these demands.
scope of work includes removal of existing gravel ballast, asphalt membrane roofing, and other roof system items to be replaced with a new "pvc" membrane roof over the entire renovated roof.
2 400 m 2 of corrosion protection work, - membrane roofing works with approx.
Tenders are invited for reroofing of original high school with gravel-faced built-up roofs with tpo membrane roofing and replacement of rooftop and above ceiling mounted hvac equipment.
Tenders are invited for safe room includes concrete: permanent forms - insulated concrete forms,icf accessories - integrated assembles, precast structural concrete, wood and plastic : rough carpentry, thermal and moisture protection : bituminous dampproofing, building insulation, vertical ribbed metal wall panel, thermoplastic membrane roofing, sheet metal flashing and trim, roof accessories, joint sealants, door and windows: steel doors and frames, door access control, finishes: gypsum board assembles, specialties: signage, toilet and bath accessories.
work include the removal of the existing roof and replacement with a new membrane roofing system.
Tenders are invited for removal and disposal of a epdm roofing system with varying ballistic rock aggregate on two separate buildings, repair any deteriorated subsurface imperfections, install all required flashing and terminations, install a 60 mil membrane roofing system on each building, separate bid for the above with 45 mil membrane roofing system on each building.
Tenders are invited for aluminum-framed entrances, storefronts, and glazing; metal wall panels; flashing, trim, and insulation; sheet metal roofing; painting and coatings; ac paving; site furnishings; installation of hm frames and doors; wood doors; door hardware; finish carpentry and casework; site concrete; tiling; accordion folding panel partitions; rough carpentry; misc metals; final cleaning; overhead coiling doors and grilles; projection screens; membrane roofing; and access doors and frames.
Full browser ?