topside

(redirected from Topsides)
Also found in: Dictionary, Encyclopedia, Wikipedia.
Graphic Thesaurus  🔍
Display ON
Animation ON
Legend
Synonym
Antonym
Related
  • noun

Words related to topside

(usually plural) weather deck

References in periodicals archive ?
Subsequently, Boskalis transported the 24,300 tons topside which was also built in Korea.
Like a gigantic forklift, it will raise and remove the topside - - the part of the platform housing the accommodation block, helipad, as well as drilling and other operational areas - of the first of them, the Delta, in a matter of weeks.
In addition, its topsides lift equipment has been fitted with an active motion compensation system.
After loading, the topsides will take nearly four months for installation and launching, he said.
The company has handled more than 60 structures in the past, including the North West Hutton platform, the Shell Leman topside and jacket and the Shell Expro topsides.
The company also highlighted its feat in lifting a 10,000-tonne topside of a semi-submersible and reported it had signed a deal with a Polish firm to investigate areas of mutual cooperation.
Under the contract, KBR will provide laser scanning of the entire Benguela Belize Lobito Tomboco topsides, FEED verification, detailed engineering and procurement services and the topsides design will include multiple equipment packages, it said.
Wood Group Mustang, a global project management, engineering, procurement, and construction operations business serving the upstream oil & gas, refining & chemicals, pipeline, automation & control, and industrial markets, has received the topsides detailed engineering and procurement support for the semi-submersible central processing facility (CPF) in the Ichthys field development from Samsung Heavy Industries Co.
Samsung will be responsible for the engineering, procurement and construction of the topsides and living quarters.
Traditionally the topsides are lifted onto the support structure or jacket by a floating crane.
On leaving the yard in 1Q 2012, the vessel will head to Brazil for final installation and integration of topsides.
HOUSTON -- KBR (NYSE: KBR) announced today that it has been awarded a contract to execute the topsides detailed design for TOTAL's CLOV floating production, storage and offloading (FPSO) unit.
The contract represents the partners first ever deal for three substation topsides at a time.
Topsides are under construction for other phases of South Pars, the massive offshore gas field shared by Iran and Qatar.
The 1,640-ton Cygnus Alpha Wellhead topsides left the fabrication hall of Heerema Hartlepool's Victoria dock facility in late December.